Publications
X Author: Nick Manderlink
2025
Rand, Joseph, Nick Manderlink, Steven Zhang, Chris Talley, Will Gorman, Ryan H Wiser, Joachim Seel, Julie Mulvaney Kemp, Seongeun Jeong, and Fredrich Kahrl."Queued Up: 2025 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024."
(2025).
Seel, Joachim, Nick Manderlink, Julie Mulvaney Kemp, Joseph Rand, Will Gorman, Ryan H Wiser, Will Cotton, and Kevin Porter."Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities."
(2025).
2024
Gorman, Will, Julie Mulvaney Kemp, Joseph Rand, Joachim Seel, Ryan H Wiser, Nick Manderlink, Fredrich Kahrl, Kevin Porter, and Will Cotton."Grid connection barriers to renewable energy deployment in the United States."Joule
(2024) 101791. DOI